Technical excursions
Excursions can be cancelled if less than 15 persons register.
Technical excursion 1: CANCELLED!Yara Siilinjärvi phosphate mine is a large open pit operation, annual mining volume is about 32 Mt. The technical excursion concentrates on fleet management system, automatic slope monitoring system and mill automation.
|
|
_________________________________________________________________________________________________________________________________
Technical excursion 2 Bus to Kemi mine leaves from Radisson Blu Oulu (Hallituskatu 1) at 7.00
|
|
_________________________________________________________________________________________________________________________________
Technical excursion 3: The best pieces of BIM based Building Construction of Skanska Thursday 18th June 2015 FULL! Excursion starts in front of Sokos Hotel Arina Oulu (Pakkahuoneenkatu 16) at 8.30. (Walking excursion) Skanska has implemented BIM on many types of projects (for example, buildings, roads, bridges, tunnels and industrial plants) and has realized a variety of benefits, including improved communication amongst project stakeholders, enhanced efficiencies, greater certainty for both schedule and cost conformance and the reduction of risk. Skanska recognizes that BIM affords us the opportunity to deliver a higher quality product in the most efficient manner to our clients.
Shopping Center VALKEA:
|
|
|
______________________________________________________________________________________________________________________________
Technical Excursion 4
Thursday 18th June 2015
CANCELLED!
- The Most Advanced BIM based Automation in a major Railway Construction Project
- Hosted by: General Contractor Destia Oy
- Presentation and site visit
- Site Kokkola-Ylivieska Dual Rail Construction Project, about 2 hours from Oulu, bus connection arranged, lunch included
- Cost: 60 eur (incl. VAT 24%)
- Time: 8:00-16:00
- More info about Destia: Destia